• Projects

    Keyser River

    JG Afrika was appointed to provide specialist hydrological and hydraulic input to a scoping study to investigate the widening and rehabilitation of the lower Keyser River.

    Read More

    DEA Landfill Sites Backlog

    Address the backlog of unauthorised waste disposal facilities in South Africa.  Phase 1 involved all non-landfill facilities and Phase 2 involved visiting all landfill sites.

    Read More

    De Aar & Droogfontein

    JG Afrika was responsible for the civil design work for both the De Aar and the Droogfontein PV solar farms and monitored the construction on both sites.

    Read More
    • All

    Gautrain Rapid Rail Project

    JG Afrika was involved in the structural design of five multi-span rail over road, rail over river and road over rail bridges on the Gautrain project. 

    Read More

    Impala Platinum Mine

    This project called for a visual inspection of the road network on the Impala Platinum Mine near Rustenburg, Gauteng.

    Read More

    Sishen Airport Upgrade

     Kumba Iron Ore required a number of facilities to be upgraded at the Sishen Airport near Postmasburg, Northern Cape.

    Read More

    Leandra WWTW

    A parallel activated sludge Biological Nutrient Removal (BNR) plant was designed which incorporated Ferric Chloride dosing for phosphate removal.

    Read More