• Projects

    OR Tambo Boreholes

    It was necessary to establish the location of all municipally owned boreholes and make quantitative assessments of groundwater abstraction.

    Read More

    Noblesfontein Geotech

    This project required 41 wind turbine generators to be set on a site with sensitive founding conditions due to high bearing pressures and dynamic loads. 

    Read More

    Umfolozi River Storage Dam

    The feasibility study for the proposed Umfolozi River off-channel storage dam required a multi-disciplinary team to undertake various aspects of the hydrology.

    Read More
    • All

    Gautrain Rapid Rail Project

    JG Afrika was involved in the structural design of five multi-span rail over road, rail over river and road over rail bridges on the Gautrain project. 

    Read More

    Noblesfontein Wind Farm

    The Noblesfontein Wind Farm, in the Eastern Cape, has forty-one turbines and a 73.8 MW wind turbine generator power plant. JG Afrika was the owner's engineer on the project.

    Read More

    Transnet Coal Line

    This Transnet Capital Projects appointment involved the geotechnical investigation of the Dumbe bypass near Paulpietersburg, KwaZulu-Natal. 

    Read More

    Kalia Mine Haul Road

    Bellzone Mining Limited required a preliminary design and cost estimate for a haul road from Yomboyelli town to the Kalia Mine in Guinea, West Africa. 

    Read More